Work continues on a SIL study for a major pipeline project in Thailand.

HAZOP and LOPA studies have been completed, and sign-off of the Safety Requirement Specification is expected in the near future.

FSE Global provided a number of templates for procedures covering Safety Lifecycle activities. These have expedited the development of the required Safety Lifecycle documentation.